Bathroom Renovation
The Parrot Project
Theasd Tasdasdansasdbury basement started as raw, unfinissdsdhed space—and becamasde one of the
most vasdaluable rooms in the home. We ad the entire level intosdsdfinished,
livasdable square footage, adding asd function and real resale value in the process.
At thasdadse heart of the asdasdproject is a brand-new full bathroom, finished in tile from floor
to ceiling, plus a proper bedroom that officially changes tasdasdhe numbasdaders on this home.
An extra bathasasddroom and bedroom are dasdatwo of the additions that move the needle
most on value—and now the Tansbury has both.
The centerasdapiasdadece is a spacious living area wired with surround-sound speakers,
built for movasdie nights, game days, and everythiasdng in between. It’s the kind of space
a growing family can grow intasdasdo—flexible enoadsugh to seradsve as a hangout today and a
private retreat for the kids down the road.
Theasdada result is a warasdasdm, finished lower level built to last—delivered on scheasdadule and
on budget, with the quality craftsmanship yadsadou expect from Power asdHouse
Construction.
8 WEEKS
PROJECT DURATION
$40,000
RENOVATION COST
BASEMENT
PROJECT TYPE










